Which version should I run?

Your situation Run this Why
Mission-critical, strict change control, SLAs 5.26 LTS (neo4j:5.26-enterprise) Feature-stable, fixes-only, longest support lifecycle. Nothing new churns under you.
Want the latest features; agile / non-mission-critical the operator-validated CalVer anchor (named in each operator release, e.g. 2026.08) Newest capabilities, validated by the operator's CI.
Evaluating / dev / test either CalVer for newest features, LTS for stability.

Features with their own version floor

  • Cross-cluster replication needs Neo4j 2026.08+ on the downstream cluster — the version that introduced CREATE REPLICA DATABASE. The validated anchor meets it; the 5.26 LTS does not. On an older image the Neo4jReplicaDatabase CR fails with ReplicaVersionTooOld, naming both the requirement and the version it found. The upstream has no such floor (2025.01+ is enough) and must not be newer than the downstream. See Cross-Cluster Replication.
  • Split backup archives (Neo4jBackup spec.options.splitArchivePartSize) need Neo4j 2026.09+, newer than the current anchor. On an older target the backup is refused with a message naming the field and the image. See Split backup archives.

Enterprise Edition images only — Community is not supported. Versions older than 5.26 (4.x, 5.0–5.25) are not supported.

Support lifecycle — what you can plan around

  • 5.26 LTS is supported for the duration of Neo4j's own LTS lifecycle (~3.5 years from its GA — roughly mid-2028; see Neo4j's published support schedule for authoritative dates).
  • You will not be force-migrated. When the next LTS ships, the operator adds it but keeps supporting 5.26 until 5.26 reaches Neo4j end-of-life — so the operator is never stricter than the database. You get the full vendor overlap (~1+ year) to plan and test your migration.
  • CalVer is a stay-current track: Neo4j itself supports only the latest CalVer, and so does the operator (see below).

What "supported" means: validated vs. best-effort

The two tracks carry different guarantees — this matters for production sign-off:

  • Validated (tested, guaranteed): 5.26 LTS, and one anchor CalVer per operator release (named in its release notes). These run in the operator's integration CI and are what we stand behind.
  • Allowed (best-effort): any CalVer newer than a release's anchor. The operator doesn't upper-bound CalVer — auto-detection (major >= 2025) means newer releases run unchanged — but "runs" is not a tested guarantee.

Why the distinction is load-bearing for the operator specifically: it emits config and Cypher that Neo4j strictly validates (server.config.strict_validation.enabled=true, Cypher 25 DDL). A CalVer released after an operator version can rename/remove a config key the operator writes, or change a Cypher default — and the pod won't start. So a brand-new, untested CalVer genuinely can break the operator; the fix ships in the next operator release. For production, run the validated anchor CalVer (or 5.26 LTS); treat newer CalVers as best-effort until a later operator release validates them.

How non-breaking releases let features arrive gradually

Neo4j's release model is what makes new-version support a smooth ramp rather than a series of cliffs — a real benefit for enterprise planning:

  • Features are additive. New capabilities land in CalVer incrementally, and previously-available functionality keeps working. The operator adopts each feature when it appears, gated to the release that introduced it, while older versions keep the old path — one codebase, e.g. property sharding gated to ≥ 2025.12, ServerSeedProvider to ≥ 2026.04, remote-address-resolution defaulting on at ≥ 2025.09.
  • Deprecations come with a runway. Neo4j announces a deprecation only once a replacement exists, warns across versions, and removes only a major later. The operator adopts the replacement early (gated) and retires the old path lazily — e.g. the recreate-database procedure switches dbms.cluster.recreateDatabase (5.24–2025.03) → dbms.recreateDatabase (2025.04+), carrying both until the floor moves past the old one.
  • The LTS is a snapshot of CalVer you've already been running. Because a feature line becomes the next LTS after ~2 years, everything in a new LTS shipped in CalVer months earlier. By the time it's blessed as LTS, the operator already supports it — the transition is a config/CI change for you, not a migration scramble.

Caveat: "non-breaking" is a guarantee about user-facing functionality (queries, drivers, app compatibility). The operator also sits on the config/ops emission surface, where keys can be renamed/removed across CalVers — hence the best-effort caveat above. Feature adoption ramps smoothly; operator-emitted config still needs per-CalVer validation.

Upgrades & version transitions

Neo4j supports any-to-any rolling upgrades within a track (e.g. any 5.x to a later 5.x in one step, zero-downtime in a cluster), and the operator orchestrates the rollout. For the mechanics (rolling vs. recreate, pre-upgrade health checks, store-format upgrades), see the Upgrades guide. The LTS→LTS transition is non-disruptive for you: nothing is dropped until your current LTS reaches Neo4j EOL.

The policy (how the support set evolves)

The operator supports the current Neo4j LTS line plus the current CalVer feature line. A new LTS is added at its GA; the previous LTS is dropped only when it reaches Neo4j end-of-life, not when the new LTS ships.

Today this maps to 5.26 = the active LTS + 2025.x/2026.x = the feature track. The numbers behind it:

LTS (feature-stable) Feature release (CalVer)
Cadence every ~2 years frequent, cumulative
Vendor support lifecycle ~3.5 years only until the next release
Migration overlap ~1 year between consecutive LTSs n/a
Path to LTS — a feature line becomes the next LTS after ~2 years

Because the LTS lifecycle (~3.5y) outlasts the LTS cadence (~2y), two LTS lines are supported by Neo4j at once for ~1.5 years. The operator mirrors that:

  • Steady state = two anchors (current LTS + current CalVer) — the bounded matrix this policy optimises for.
  • Transition = briefly three anchors (old LTS + new LTS + CalVer) through the overlap, back to two when the old LTS reaches EOL.
5.26 GA (Dec 2024) ──────────────────────────────── 5.26 Neo4j EOL (~mid 2028)
                              new CalVer LTS GA (~2yr later)
                              │
   operator supports:        │
   5.26 + CalVer ────────────┤ + new LTS  (3 anchors, overlap) ──┐
                             add new LTS                          drop 5.26 here
                                                                  (2 anchors again)

Release quality: the gates every release passes

"Validated" isn't a claim, it's a pipeline. The unit/drift, install-confidence and supply-chain steps below are wired into the release workflow itself — a release cannot be published unless they pass. The integration suites run separately (per PR, or on demand during release preparation); they are not release-workflow gates:

Gate What it proves When it runs
Unit suite + drift gate Code behavior pinned by ~thousands of unit tests; CRDs, RBAC, Helm chart, and OLM bundle are regenerated and diffed — published manifests always match the code Every PR, and again on the release tag (blocking)
Core integration suite Reconcile contracts (cluster formation, standalone lifecycle, databases, backups) against real Neo4j on Kubernetes — on both supported lines (5.26 LTS and the pinned CalVer) Every runtime-affecting PR
Extended integration suite The full matrix: scaling with drain, split-brain recovery, the complete backup/restore matrix (PVC, cloud, chains, hooks), sharding On demand (manual dispatch) — not triggered by the tag
Install-confidence gate Five legs on a fresh cluster: Helm install in cluster and namespace-scoped RBAC modes (with a live smoke deployment), Helm upgrade from the previous published release including the mandatory CRD refresh, documented-order uninstall with live resources, and the kubectl server-side-apply path Inside the release pipeline — release images are not built or pushed until it passes (blocking)
Signed supply chain Multi-arch (amd64/arm64) images signed with Sigstore Cosign keyless signing; OLM bundle validated with operator-sdk Every release

Verify an image signature yourself:

cosign verify ghcr.io/priyolahiri/neo4j-kubernetes-operator:<tag> \
  --certificate-identity-regexp='github.com/priyolahiri' \
  --certificate-oidc-issuer='https://token.actions.githubusercontent.com'

Platform compatibility

  • Kubernetes: 1.32+ (CI runs the matrix on upstream Kubernetes via Kind).
  • Managed clouds (EKS, GKE, AKS): supported; cloud backups/restores authenticate via each cloud's workload identity (IRSA / GKE Workload Identity / Azure Workload Identity) or explicit credential Secrets — see Backup & Restore for per-cloud setup.
  • OpenShift: install via OLM/OperatorHub; the chart's security contexts can defer to SCCs (podSecurityContextEnabled: false).
  • NetworkPolicy: enforced policies require a CNI that implements them (e.g. Calico, Cilium); Flannel ignores NetworkPolicies silently.

FAQ

I'm on 5.26 and a new LTS just shipped — will the next operator drop me? No. 5.26 stays supported until Neo4j's own EOL for the 5.26 line (~mid 2028), regardless of how many operator releases ship in between. You migrate on your schedule, within the overlap window.

Do you support every CalVer that ships in a given window? No. Each operator release validates one anchor CalVer; newer CalVers in the major are allowed (forward-compatible) and usually work, but best-effort — because the operator emits strictly-validated config/Cypher, a future CalVer can break it until the next operator release catches up. This matches Neo4j, which supports only the latest CalVer.

Can I keep running an older CalVer? The operator won't block it, but neither Neo4j nor the operator supports an old CalVer — the model is stay-current. For a stable, long-supported floor, use 5.26 LTS instead.

Why not just support every LTS forever? Each supported line multiplies CI cost, branch maintenance, and inter-version compatibility surface. Bounding the matrix to "current LTS + feature line" (briefly +1 during overlap) keeps the operator fast to maintain without ever lagging the database's lifecycle.